Coolroom & Freezer Heat Load

Refrigeration

Measure the room, check how it is used, record the plant and review the refrigeration duty.

No job loaded yet — enter your room details below, or click Load sample values to see example numbers.

Job details optional

Technician and business names are read from your existing app settings when available. Blank details are shown as not entered in the report.

Guided coolroom assessment

Record existing equipment optional

Read the nameplates and supplier data. Leave unknown details blank. These records do not change the heat-load calculation or prove the plant can meet it.

Duty includes a daily energy check and a coincident product-cooling check. Match it to OEM capacity at actual operating conditions; verify product-core cooling and ground/floor design separately.

Calculated refrigeration duty
— kW
— BTU/hr  ·  — kJ/day

Load breakdown 24-h average

Capacity —