Start with the symptom. Record what you find, follow the next check and carry your evidence into the handover. Open explanations when you need them.
For an AC system that runs but isn't cooling, or is cooling poorly. This procedure separates airflow problems from charge problems before you open the refrigerant circuit. For coolrooms and fridges, use Coolroom / Fridge Not Holding Temp.
0 / 6 steps checked
Record the exact unit, cooling demand, operating mode, outdoor conditions and actual compressor/fan state before taking readings. If the plant is not running, follow the relevant controls or no-start workflow first; only interpret operating readings under the unit’s required test conditions.
Start with accessible observations: filter condition, coil cleanliness/icing, fan operation and blocked supply/return paths. Isolate under the site procedure before opening guards or cleaning. Record what changed and recheck the airside conditions before interpreting refrigeration readings.
Record return and supply air temperatures, indoor humidity and operating conditions. A high split can suggest low airflow; a low split can reflect load, humidity, airflow, controls or refrigeration capacity. Use the tool as a screening check, then compare the actual airflow and the exact unit’s procedure.
Airflow / Delta-T CheckAfter confirming airflow, coil condition, load and operating mode, take pressure and pipe-temperature readings if authorised and needed for the OEM test. Superheat and subcooling help investigate possible causes; they do not prove charge or justify adding gas by themselves. Match the metering device and the manufacturer’s charging procedure.
Superheat & SubcoolingConfirm the refrigerant, gauge units and measurement location, then cross-check pressure against the matching saturation data. For blends, use the appropriate dew/bubble reference for the calculation. A PT comparison does not establish the correct charge; follow the exact OEM charging/test procedure.
PT ChartIf refrigerant was handled, record its type, quantity and movement before leaving site. Finish by recording the before/after cooling evidence, remaining unknowns and the next action; leaving this step unchecked can mean no refrigerant was handled, not unfinished diagnosis.
Refrigerant logbookFor a coolroom, freezer or commercial fridge that cannot pull down or hold temperature. Establish the controller state, load, airflow, defrost and heat-rejection evidence before deciding whether refrigerant-circuit tests are needed.
0 / 6 steps checked
Record the exact equipment/controller, alarm and time, setpoint, differential and actual compressor/defrost state. Compare the displayed probe reading with an independent reading at a comparable location. Note recent product loading and door use. If the plant is stopped or locked out, follow the controls/no-start workflow before taking operating readings.
Look for an iced-up coil, dead evaporator fans, or product stacked against the airflow. An iced coil can involve defrost, airflow, infiltration, loading or refrigeration faults. Establish the icing pattern and cause, then restore the required test conditions before interpreting charge readings.
Record condenser condition, fan operation, entering-air conditions and possible hot-air recirculation. A dirty coil or poor heat rejection is an investigation path, not an automatic diagnosis. Isolate before cleaning or guard access, then verify the required operating conditions before interpreting refrigerant readings.
When authorised and required by the exact OEM procedure, record pressure and pipe temperature at named locations with the refrigerant, metering device, load and operating state. Compare superheat/subcooling with that procedure and the operating envelope. These readings can support a feed, charge or load investigation; they do not establish charge by themselves.
Superheat & SubcoolingConvert measured pressure to the appropriate saturation temperature for the refrigerant, then compare readings at the documented locations. Room air temperature is not refrigerant evaporating temperature. Investigate charge, feed restriction, load or compressor capacity only with the supporting OEM test; modulation and capacity control can change the same readings.
PT Chart Start & Run DiagnosticsReview product loading, door use, infiltration, defrost time and the required pull-down/holding duty with the coolroom heat-load tool. Compare load with matched plant performance data. Record refrigerant handled if applicable, the recovery trend after work, remaining unknowns and follow-up action.
Coolroom & Freezer Heat Load Refrigerant logbookFor refrigeration plant that's dead, short-cycling or locked out — tracing the mechanical control circuit: transformer, stats, pressure controls, klixons, defrost circuit and the safety chain, in order. For PCB-based AC systems use HVAC Control Fault-Finding.
0 / 6 steps checked
Use the approved isolation/lockout procedure, verify the tester before and after proving dead, and address stored energy before dead tests. Read the exact unit wiring diagram and rated control voltage. Energised fault finding is a separate, justified task for a competent authorised person using the required risk controls and rated instruments; re-isolate and prove dead before continuity or resistance checks.
Controller ManualsUse the exact wiring diagram to identify the control supply and rated voltage. Under the authorised test procedure, record where supply is present or lost, including the relevant fuse, transformer or supply module and terminals. Re-isolate and prove dead before continuity/resistance tests; a missing supply requires investigation before judging downstream controls.
With the circuit isolated, proved dead and stored energy made safe, trace the safety chain using the OEM continuity/resistance procedure. Never use continuity mode on an energised circuit. If supply-voltage measurements are necessary, follow the separately authorised energised-testing procedure and re-isolate before returning to dead tests.
Pressure control: compare its cut-in / cut-out settings against the actual gauge reading and saturation data — is it open because it's faulty, or because the pressure really is out of range? Thermostat: compare its switch point against a trusted probe.
PT ChartCompare the documented command, permissives and contactor/load response. Chattering or poor output can involve the supply, connections, coil or contacts; record the evidence before assigning a cause. Voltage checks require the authorised energised-test procedure. Coil resistance checks require isolation, proving dead and the exact OEM test.
After authorised rectification, observe the required operating cycle and compare current, pressures and control behavior with the OEM limits and actual load. Record original/final settings, what was changed, the result, unresolved evidence and next action. One successful start does not close an intermittent fault.
Start & Run DiagnosticsFor PCB-controlled AC — splits, ducted, VRF — that's dead, flashing a fault, or not responding. Capture the fault and operating state first, then compare sensors, commands and responses with the exact OEM procedure before choosing a component.
0 / 6 steps checked
Capture the current fault code/LED pattern, available history and time before any reset or power change. Match the exact equipment, controller and manual revision; a code identifies an investigation path, not a failed part. Display and stored-history behavior depend on the model.
Fault Codes Controller ManualsIsolate, lock out, prove dead and follow OEM stored-energy precautions before inspecting fuses, terminals and interconnect wiring or performing continuity tests. If diagnosis requires supply/transformer voltage under power, use a separately authorised energised-test procedure with the rated voltage from the exact wiring diagram, then re-isolate before further dead tests. A comms symptom alone does not condemn a board.
Under the approved isolated test, identify and disconnect the sensor as directed by the OEM, then record its resistance and independently measured temperature. Compare with the exact sensor’s resistance/temperature chart and tolerance. Do not assume a universal nominal resistance or compare unlike sensor types.
Compare demand, permissives, board command and the actual load/feedback for the installed output type. Separate “no command” from “command present but no response”. Electrical output measurements require the separately authorised procedure and rated instruments; re-isolate before dead tests. Missing feedback alone does not condemn a board or load.
Follow the exact OEM isolation, stored-energy wait and DC-bus verification procedure before access. Use only the specified drive/IPM and compressor tests, including required disconnection and test limits. Do not apply an insulation test through connected inverter electronics or assume a fixed-speed test is suitable. Stop and escalate if the approved procedure or competence is missing.
After authorised work, run the OEM verification sequence and compare the operating evidence with the expected mode/load. Record original fault/history, confirmed cause or remaining uncertainty, work performed, final readings and follow-up. Note the observation period; one cycle cannot prove an intermittent fault will never return.
Start & Run DiagnosticsFor a compressor that hums, trips or does not start. Identify the installed motor/start method first: fixed-speed single-phase, three-phase or inverter/drive. Follow the matching supply, controls, protection and OEM test path before assigning a compressor fault.
0 / 6 steps checked
Isolate, lock out, prove dead and follow the OEM capacitor/DC-bus discharge procedure before contact, capacitance, resistance or continuity tests. Prove the tester before and after proving dead. Later operating voltage/current measurements require a separate justified energised-test procedure by a competent authorised person; re-isolate before returning to dead tests.
If the installed motor uses a start/run capacitor, follow the OEM isolation/discharge procedure and measure out of circuit against the marked rating and tolerance. For other starting arrangements, record that this test is not applicable and use the exact motor/drive procedure. Never apply a capacitor test simply because the compressor will not start.
Start & Run DiagnosticsWhere a contactor is fitted, compare the cooling call/permissives, rated coil supply and actual operation under the separately authorised test procedure. If no command or supply reaches it, follow the controls path. If it operates but the load supply is wrong, investigate contacts, connections and supply; do not assign a failed contact from the symptom alone.
Refrigeration Control Fault-Finding HVAC Control Fault-FindingIf justified under the authorised energised-test procedure, measure operating voltage/current with appropriate equipment. Compare RLA/FLA/LRA ratios with the OEM MCC, load/modulation and operating envelope. Current alone does not prove overload, locked rotor or low refrigerant charge.
Start & Run DiagnosticsFor applicable, authorised three-phase operating tests, record all three line-to-line voltages and line currents at named locations. Compare imbalance with the exact OEM limit, starting method and load. These observations alone do not prove a winding or refrigerant fault. Re-isolate before connection or winding tests; drive-fed measurements need the specified method.
Start & Run DiagnosticsReview the matching supply, controls, protection, start components and permitted motor/drive tests before deciding the next investigation. Use pressure/saturation evidence only where relevant to the OEM procedure. These checks do not prove a mechanical fault; record a supported cause or the missing test, then escalate before quoting a compressor replacement.
PT ChartFor an initial AC replacement/install load estimate and a documented supplier selection. Record measured inputs and assumptions; the estimate is not a complete equipment design or proof that a nominal capacity suits the site.
0 / 5 steps checked
Follow the guided AC assessment. Measure each separately served room and the net areas of walls, roof and glazing; subtract openings counted separately. Record the reviewed construction U-values and the cooling-load/solar factors for each design condition.
Heat LoadEnter reviewed outdoor temperature, humidity and absolute site pressure, plus the indoor targets. The optional climate catalogue is a reference; selecting a station does not fill the calculation. Add further hot-weather or humidity conditions when relevant and record the source.
In the Existing equipment step, record the unit model, serial number, refrigerant and known capacity, with rating conditions in the notes. The result compares the entered load with recorded nominal capacity; this alone does not establish equipment suitability.
Record whether humidity and outside-air loads have been accounted for. Use Psychrometrics when measured/design air properties are needed, and obtain the missing ventilation or latent-load input before final selection. If no separate check is needed, record the reason; do not treat an unchecked step as evidence that latent load is zero.
PsychrometricsGenerate the supplier report from the reviewed Heat Load result, including design conditions, uncertain inputs and the required operating duty. Ask the supplier to confirm equipment performance at those conditions, then record the selected equipment and any remaining design work.
For sizing refrigeration plant for a coolroom or freezer, or checking whether existing plant matches the room's real load.
0 / 5 steps checked
Measure length, width and height, and confirm the target holding temperature (coolroom or freezer) before entering anything.
Check the complete panel and door specifications for U-values, measure the door openings, and obtain a reviewed incoming-air estimate. Ask what stock arrives each day, its mass and arrival temperature. Use the product reference for the thermal properties requested by the guide.
Follow the guided Coolroom assessment: room, construction and doors, stock, internal loads, equipment and operating hours, then Review. Confirm None for absent loads; leave unknowns blank and return to them. Record the existing condensing unit and evaporator. The room target determines coolroom/freezer mode; the buttons do not provide design presets.
Coolroom & Freezer Heat LoadCompare calculated load with matched plant/evaporator performance at the stated refrigerant, evaporating and condensing conditions. Include actual operating hours, defrost allowance and pull-down duty. If existing plant cannot hold temperature, establish airflow, controls, load and heat-rejection evidence before any conditional OEM refrigeration test; SH/SC alone does not establish charge.
Superheat & Subcooling PT ChartIf rectification involved refrigerant, record its type, quantity and movement. For a sizing-only visit, note that none was handled. Finish with the selected performance conditions, supplier/design confirmation and unresolved assumptions or further work.
Refrigerant logbook